OEM Service
Product Customization Process
1
Requirement Communication
2
Quotation and Contract
3
Sampling and Confirmation
4
Mass Production
5
Quality Inspection and Delivery
ADVANTAGE
Advantages
The company mainly produces slow rebound memory foam series adult neck pillows, travel U-shaped pillows, car seat headrests and lumbar supports, home office seat cushions and lumbar supports, children's neck protection pillows, infant head shaping pillows, gel pillows and other memory foam series products, with a monthly production capacity of more than 300,000 pieces, maintaining long-term friendly business relations with more than 200 brand enterprises at home and abroad.
Mingjie people continuously focus on innovation, brand, and service, with "Achieving Customers" as our core value, relying on the power of the internet to continuously expand domestic and international markets, striving to be an industry benchmark.
1. Requirement Communication
Customer provides requirements (can be through drawings, samples, or text descriptions):
- Custom by drawing: Provide design drafts/3D files (must indicate dimensions, thickness, curves, and other details).
- Custom by sample: Send samples, factory replicates and optimizes.
- New design: Customer explains requirements (such as U-shaped neck pillow, wave shape, zoned support, etc.), factory provides solution suggestions.
- Confirm details: Fabric type (Tencel, ice silk, bamboo fiber, etc.), pillow core density and hardness, whether to add gel/ventilation holes, etc.
2. Quotation and contract
- Factory evaluates process difficulty and material cost, provides quotation within 3 working days.
- Confirm mold fee, minimum order quantity (MOQ), delivery cycle.
- Sign contract, pay sample deposit (30%-50%).
3. Sampling and confirmation
- After receiving the mold, factory makes 1-3 samples and sends to customer for testing (cycle 5-10 days).
- Customer provides feedback for modifications, adjust until satisfied.
- Sign sample confirmation letter, lock technical parameters.
4. Mass production
- Factory procures materials and produces (cycle 15-30 days, depending on quantity).
- Provide production progress photos/videos (optional service).
5. Quality inspection and delivery
- Full inspection or sampling inspection (according to customer requirements).
- Pay balance, arrange logistics.